Datasheet 02 / 05
Digital Assisted Site Walkdown Add-on to Asset Uplift

Nameplates checked in the field.

Our field team photographs each nameplate on the walkdown. Make, model, serial number and ratings are confirmed on that asset’s record, with the photo kept as proof.

At a glanceDigital Assisted Site Walkdown
For
Site maintenance teams, planners and supervisors
Comes with
Asset Uplift
You receive
Confirmed nameplate values with a photo behind each
Priced
Per asset walked down, plus travel and expenses
Who it’s for

For teams who want the register proven on site.

Sold only with Asset Uplift, because it checks the Asset Uplift register against the plates on your equipment.

Roles
  • Site maintenance teams
  • Planners and supervisors
When

Alongside an Asset Uplift engagement, when you want register data verified in the field, not taken from drawings alone.

Industries
Oil & gasMining & mineral processingPower generationChemical & petrochemicalWater & wastewater
What you receive

Confirmed values, each with its evidence.

What the walkdown adds to your Asset Uplift package.

  1. D1

    Nameplate values

    The details printed on each nameplate, confirmed on that asset’s record.

    Includes
    MakeModelSerial numberRatingsOther plate data
  2. D2

    Confirmed values in your load sheet

    Each confirmed value links to its walkdown item and photo, so every value traces back to the plate it came from.

    Includes
    Confirmed valueWalkdown itemPhoto
  3. D3

    Photo evidence

    The nameplate photo, attached to each asset record.

  4. D4

    A walkdown organized into batches

    We plan the walkdown in batches with your site and track every batch until it’s done.

Delivered inYour Asset Uplift load sheet

Every confirmed value comes with its photo.

Illustrative sample

A nameplate check, value by value.

One asset’s record after the walkdown: each plate value confirmed, with the photo kept on the record.

Nameplate check · P-204A · illustrative
MakeFrom nameplate · confirmed
ModelFrom nameplate · confirmed
Serial numberFrom nameplate · confirmed
RatingsFrom nameplate · confirmed
EvidenceNameplate photo on the record

Illustrative. Tags, values and results are examples, not client data.

Benefits

What changes for your team.

  • 01

    Register data verified in the field, not taken from drawings alone.

  • 02

    Your crews stay on their work. Our field team does the walkdown.

  • 03

    A photo behind every confirmed value.

  • 04

    Field work planned with your site and tracked until every batch is done.

How an engagement runs

Every value confirmed. You keep the evidence.

The walkdown runs inside your Asset Uplift engagement.

  1. 01 · You add

    The walkdown to Asset Uplift

    Choose a walkdown alongside your Asset Uplift engagement.

  2. 02 · Plan

    The batches

    We plan the walkdown in batches with your site, and track each one until it’s done.

  3. 03 · Confirm

    Each value

    Our field team photographs each nameplate, and its details are confirmed on the asset’s record.

  4. 04 · You receive

    Confirmed values

    Confirmed values in your load sheet, each linked to its walkdown item and photo.

Assurance

Evidence behind every value.

A confirmed value is only as good as what stands behind it. Here, that’s the plate itself.

  • Traceable to the source

    Every confirmed value links to its walkdown item and the nameplate photo it came from.

  • Nothing invented

    Every value comes from the nameplate itself, never from guesswork.

  • Confirmed on the record

    Each value is confirmed on the asset’s record before it goes into your load sheet.

  • Your systems stay yours

    You get the data, not another system to look after. Choose ERP Data Entry and we enter the records you’ve approved after a dry run.

How it fits

One journey, from first score to loaded data.

Start with a Health Check of the data already in your ERP, or go straight to Asset Uplift. Each service picks up where the last one left off.

  1. 01 · Score

    Find where your ERP maintenance data falls short.

  2. 02 · Build

    Build the register and maintenance setup from your documents.

    + Add-onThis datasheet
    Site Walkdown

    Check nameplates in the field.

  3. 03 · Cleanse

    Clean up and name every part in your material master.

  4. 04 · Enter

    Have the approved data entered for you.

Questions

Asked before a briefing.

Can we buy a walkdown on its own?
No. It comes with Asset Uplift, because it confirms the Asset Uplift register.
How are the values confirmed?
Our field team photographs each nameplate, and every value is confirmed on the asset’s record before it goes into your load sheet.
What evidence do we keep?
The nameplate photo is attached to each asset record, and each confirmed value links to its walkdown item and photo.
How is the field work organized?
We plan it in batches with your site and track each batch until it’s done.
Request a briefing

Let’s look at your asset data.

Tell us about your site and the equipment you run. We’ll show you what Digital Assisted Site Walkdown can do for your plants.